fbpx
  • About Us
  • Advertising
  • Legal Notices
Lagniappe Mobile
  • News
    • Cover Story
    • Latest
    • Serial Stories
    • Bay Briefs
    • Community News
    • Open Documents
    • e-Edition
  • Baldwin
  • Commentary
    • Damn the Torpedoes
    • Hidden Agenda
    • Beltway Beat
    • The Real Deal
    • Weather Things
    • The Gadfly
    • Letters to the Editor
  • Cuisine
    • The Dish
    • Word of Mouth
    • Beer and Loathing
    • Cuisine Directory
  • Arts
    • Artifice
    • Art Gallery
    • The Reel World
    • Calendar
  • Music
    • Music Feature
    • Music Briefs
    • Music Listings
    • Submissions
  • Sports
    • The Score
    • The Starting Line-Up
    • From Behind The Mic
    • Upon Further Review
  • Style
    • Media Frenzy
    • Mobile Magnified
    • Horoscopes
    • Master Gardeners
    • Style Feature
  • Lagnia-POD

Select Page

New bridge plan only includes fees for large trucks

Posted by Dale Liesch | Mar 22, 2021 | Latest, News | 0 |

Officials with both local Metropolitan Planning organizations and the Alabama Department of Transportation announced a plan on Monday, March 22 for a cheaper Interstate 10 bridge over the Mobile River that would only serve large trucks. 

The idea, introduced by Mobile Mayor Sandy Stimpson, Fairhope City Council President Jack Burrell, U.S. Rep. Jerry Carl, and former ALDOT Division Engineer Vince Calametti, aims to build a truck-only cable-stayed bridge and to restripe the existing Bayway with three lanes in each direction instead of two. 

Priced at $725 million, about half the funding for the project would come from state and federal sources, in the form of Grant Anticipation Revenue Vehicle (GARVEE) bonds, Calametti said. Around $400 million would come from a fee charged to trucks 46 feet and above using the bridge, Calametti said. The bridge would “most likely” be designated an Interstate 10 truck route, he said, and smaller vehicles would not be allowed on it. 

“The fee will be less than half the proposed fee included in the previous plan,” he said. “It is estimated between $10 and $15. It won’t be more than $15.” 

The 46-feet or longer stipulation, Calametti said, would prevent smaller trucks, like those used for local deliveries, from being impacted. It’s too early to speculate, he said, if the toll would ever sunset. That would be determined at a later date. 

Existing routes, including the Bankhead Tunnel, the Wallace Tunnel, the Bayway and the Causeway will remain toll free, Calametti said. 

By removing large trucks from the Wallace Tunnel, Calametti said, commute time could be cut by 60 to 90 minutes during peak travel time. Trucks will also be diverted from the Cochran Africatown Bridge, he said. The trucks would use the so-called “truck bridge” instead. 

The increase from four lanes to six lanes on the Bayway is designed to increase efficiency by some 40 percent, also during peak times, Calametti said. While the new lanes would eat up the shoulders that currently exist on the Bayway, Calametti said ALDOT would double the size of its emergency response team — stationing a truck in both Baldwin County and Mobile County. In addition, turnarounds would be added to allow distressed travelers to pull over if need be. 

The phased approach of the project would also see a second bridge and a new Bayway built under later phases, Calametti said. Unlike the last proposal, this project would be controlled completely by the state and would not be a public-private partnership. 

The timeline for construction for this concept would be 2022 to 2023, as the state would lose out on a $125 million federal grant if the project is not underway by the third quarter of 2022. This was a point Stimpson, who is chairman of the Mobile MPO, and Burrell, chairman of the Eastern Shore MPO, said was important. It was one of three points they made in discussions with Gov. Kay Ivey in January about keeping the project alive. 

“No. 1, it had to reduce congestion,” Burrell said. “No. 2, it had to protect the $125 million federal grant and No. 3, it needed to leave all the existing routes untolled. The MPO response has been very, very favorable.” 

Stimpson reiterated the importance of keeping the large federal grant active. 

“Protecting the $125 million grant is critically important,” he said. “We need to demonstrate to the federal government that there’s local support or the federal government will redirect the funds.” 

The new project, Stimpson said, would help move passengers and commerce across the bay more quickly and more efficiently, which would help secure more jobs and opportunities to the area. 

“We believe this plan is a good, solid plan,” he said. “There will be no tolls for cars and small trucks.” 

Carl, who was elected to congress in November, told the crowd gathered for a press conference that leaders he has spoken with in Washington — specifically those who’ve been trapped on the Bayway — understand the need for a bridge, as does local leadership. 

“Part of my campaign rhetoric was focused on the bridge,” he said. “Everyone agrees the bridge is needed.” 

The first step for the new project would be to gain the approval of both the Mobile and Eastern Shore MPOs, Calametti said. Following approval by the boards, ALDOT would begin to hold public hearings.

This page is available to our subscribers. Join us right now to get the latest local news from local reporters for local readers.

The best deal is found by clicking here. Click here right now to find out more. Check it out.

Already a member of the Lagniappe family? Sign in by clicking here

Share:

Rate:

PreviousGulf Coast Challenge to return in fall
NextDauphin Island Race postponed once again to 2022

About The Author

Dale Liesch

Dale Liesch

Dale Liesch has been a reporter at Lagniappe since February 2014. He covers all aspects of the city of Mobile, including the mayor, City Council, the Mobile Housing Board of Commissioners, GulfQuest National Maritime Museum of the Gulf of Mexico and others. He studied journalism at The University of Alabama and graduated in 2007. He came to Lagniappe, after several years in the newspaper industry. He achieved the position of news editor at The Alexander City Outlook before moving to Virginia and then subsequently moving back a few years later. He has a number of Alabama and Virginia Press association awards to his name. He grew up in the wilderness of Baldwin County, among several different varieties of animals including: dogs, cats, ducks, chickens, a horse and an angry goat. He now lives in the Oakleigh neighborhood of Mobile with his wife, Hillary, and daughter, Joan. The family currently has no goats, angry or otherwise, but is ruled by the whims of two very energetic dogs.

Related Posts

Bill to allow dogs in outdoor restaurant areas passes House

Bill to allow dogs in outdoor restaurant areas passes House

March 11, 2020

Congress passes $484 billion economic enhancement package

Congress passes $484 billion economic enhancement package

April 23, 2020

Notable members highlight bar association sesquicentennial

Notable members highlight bar association sesquicentennial

April 3, 2019

Missing woman’s car, human remains found submerged in Bayou Sara

Missing woman’s car, human remains found submerged in Bayou Sara

May 3, 2019

Recommended Stories

Go hence, to have more talk of these sad things

By Ashley Trice

Wordles can hurt us

By Rob Holbert

The Great Anvil Shoot of Laurel, Mississippi

By Andy MacDonald

ACAC steps to bat with new exhibit

By Kevin Lee

The Strays finally drop full-length album

By Stephen Centanni



  • Advertising
  • About Us
  • Contacts
  • Jobs
  • Terms of Service
  • Privacy Policy
  • Join the Sunday Brunch Newsletter

Search This Site

Browse the Archives

© Lagniappe Mobile 2022